Next:
List of Tables
Up:
Project Asterius
Previous:
Contents
List of Figures
1 Schematic of the Orbital Phase of Asterius' Mission
2 Schematic of the Landing Phase of Asterius' Mission, Including Surface Scanning
3
Required to Circularize Asterius' Orbit at Europa vs. Apojove
4 Labeled view of the two main modules of Asterius
5 A view of the Water/Ice Scientific Probe (WISP)
6 Schematic of the Propulsion Subsystem
7 Command and Data Handling Architecture (Note: This is a graphic from a previous report; details may be wrong.)